Service 11

Asbestos Abatement

Asbestos has to be identified and removed before demolition disturbs it, and it is common in Florida buildings put up before the 1980s. Allied handles this through their sister company, ALLIED Wrecking Industrial Services, which means the survey, the abatement and the demolition are coordinated rather than split between firms.

What the job covers

  • Survey and sampling to identify asbestos-containing material
  • Friable and non-friable material handled to the appropriate standard
  • Flooring, ceiling tile, pipe insulation, fireproofing and roofing
  • Containment and controlled removal
  • Documented disposal
  • Demolition sequenced to follow abatement

What affects the quote

  • Age of the building, which drives how likely asbestos is
  • How much material is present and whether it is friable
  • Whether a survey already exists or one has to be commissioned
  • Occupancy of the building and adjacent spaces
  • How the abatement schedule affects the demolition start

Every job is quoted after we understand the site. Photographs of what needs to come down, and of how a machine would reach it, get you an accurate number faster than a description will.

Common questions

Before you call

Do I need a survey before demolition?

For an older building it is usually required, and it is worth having regardless — finding asbestos mid-demolition stops the job and costs considerably more than finding it beforehand.

Who actually does the abatement?

ALLIED Wrecking Industrial Services, the sister company. The advantage is that abatement and demolition are sequenced together instead of being coordinated across two separate contractors.

Ready To
Clear The Way?

Tell us about the project. Allied will take it from there.

(813) 957-2150
Call Ally